Wednesday, June 17, 2009

Nothing's Gonna Break Our Stride.....




In floor Heat, check. Subfloor, check. Sliding Glass Door, check. Ceiling drywalled. check. As you can see we had another busy and productive day. It was difficult rolling out of bed this morning, as both of us were aching. However, we had a long check list to accomplish if we were going to stay on target. The in floor heat was the first to tackle and that seemed to go quite smoothly. Next was the subfloor which also went in with no problems. After the subfloor we had to make our daily trip to Lowe's to get our drywall and our sliding glass door. It wasn't until we put in the sliding glass door that I realized my husband is a construction genius. His precise measurements for the door allowed it to slide into place with no issue. I am told this doesn't happen much, which leaves me to believe he is a genius. With the door in place, the ceiling drywall began and off to Lowe's I went for our second batch of drywall. While I was gone, Adam, Steve, and Chris drywalled over half the ceiling. We are in great shape for tomorrow to finish drywall and start mudding. I hear its a pain, but no pain no gain.

No comments: